关注康恒环境微信官方账号,获取最新品牌资讯。
G. Charging hopper H. Secondary air fan I. Primary heater J. Primary air fan K. Incinerator L. Slag extractor M. Waste heat boiler N. Residue (ash and slag) crane
O. Acid removal reactor P. Activated carbon Q. Hydrated lime storage silo R. Bag filter system S. Steam generator heater T. Selective catalytic reduction system U. Gas-gas heat exchanger V. Scrubber
W. Stack
A. Overhead crane for turbine room maintenance B. Turbine generator set C. Deaerator
A. Overhead crane for turbine room maintenance B. Turbine generator set C. Deaerator D. Tipping floor E. Tipping door
A. Overhead crane for turbine room maintenance B. Turbine generator set C. Deaerator D. Waste delivery area E. Waste dumpling gate F. Waste crane G. Charging hopper H. Secondary air fan I. Primary heater J. Primary air fan K. Incinerator L. Slag extractor M. Waste heat boiler N. Residue (ash and slag) crane O. Acid removal reactor P. Activated carbon Q. Hydrated lime storage silo R. Bag filter system S. Steam generator heater T. Selective catalytic reduction system U. Gas-gas heat exchanger V. Scrubber W. Stack
We have the core equipment and technology of solid waste incineration plant | with EPC, rich experience in production and operation | with the service ability of the whole industrial chain
The organic combination of hardware and software ensures the "efficient power generation" of waste incineration projects in an all-round way.
SUS Environment implements a project manager responsibility system, assigning an EPC project manager to engage from the market development stage. This encompasses the entire project process, including bidding, contract negotiation, project execution, and project acceptance. A project management target responsibility agreement is signed to effectively control project management goals related to engineering costs, schedule, safety, quality, and documentation.
As an excellent EPC contractor, SUS Environment leverages its extensive experience to ensure high coordination among the three key plans: design, procurement, and construction. This overall synergy enhances comprehensive efficiency and effectively shortens the construction period.
As a leading domestic professional equipment integrator, SUS Environment has established strategic partnerships with numerous domestic and international companies. With extensive experience in similar projects, we can not only commit to the overall plant performance but also ensure performance optimization and improved power generation efficiency. Additionally, we can accelerate project progress without increasing construction costs.
To ensure that the owner maintains process control over the EPC contractor, SUS Environment implements communication, inspections, reporting, and documentation throughout the design, procurement, and construction phases. We adhere to an open cooperation approach, maintaining timely communication with the owner.
· Possesses design technology and manufacturing capabilities for core equipment such as incinerators, flue gas systems, and water treatment.
· Holds a market share of 40% in the incinerator sector, ranking first in the industry.
· Capable of providing comprehensive consulting services.
· Effectively integrates and connects all stages, including design, procurement, construction, commissioning, and operation.
· Established a design and operation feedback mechanism that leverages big data for continuous design iteration and updates.
· Ensures design "operability" and design "reliability".
· Possesses investment, construction, and operation experience from nearly 70 projects.
· Strong ability to reduce costs and improve efficiency while ensuring stable, economical, safe, and environmentally friendly operations.
· Collaborates with numerous suppliers, design units, and construction companies.
· Equipped with strong resource integration and bargaining capabilities.